Hi Craig,
Thank you for your questions about LNG storage at the Woodfibre LNG facility.
The Project will have a permanently moored LNG floating storage and offloading unit (FSO), with a capacity of between 170,000 and 250,000 m3. The FSO will be constructed using two LNG carriers, which will be redesigned and retrofitted for this purpose.
There will also be a single marine mooring facility, which is currently undergoing detailed design as part of our parallel FEED (Front End Engineering Design) process. You can learn more about the FEED process currently underway by clicking here.
Construction will begin, pending permitting, once FEED is complete and the EPC (Engineering, Procurement and Construction) contract has been awarded.
Warm regards,
Woodfibre LNG Team